Featured image for Memorial Day

May 29, 2023

Wastewater Visibility News

Memorial Day

The teams at U.S. Submergent and SediVision® wish everyone a safe Memorial Day as we remember and honor our country’s fallen military heroes.

Keep reading

November 30, 2021

Wastewater Visibility News

Probing vs Complete Visibility Inside Wastewater Tanks

SediVisionTM Reveals Over Three Times The Amount Of Material Than Estimated In central Florida, a wastewater treatment facility was experiencing loss of capacity and inefficiency with one of its aeration basins.  They probed this 140 by 40-foot digester from a few accessible spots along the walkway and hit concrete every time, indicating minimal material buildup.  However, the aeration basin was still using more energy than required and seemed to be suffering from a loss in capacity.  This facility could not logistically drain this tank down and wanted to know precisely what was occurring under all that dark water.  U.S. Submergent

Keep reading

October 26, 2020

Wastewater Visibility News

Clean large diameter pipe while in service

Over 4,800 Feet of Large Diameter Pipe Cleaned and Inspected While in Operation In Central Florida, U.S. Submergent Technologies (USST) cleaned and inspected over 1,900 linear feet of 36” pipe and 2,800 linear feet of 48” pipe. Our patented and versatile Combination3® Truck allowed USST to clean these large diameter pipes while they remained in service, with no need for bypass or shutdown. During the 2020 rainy season, pipe systems were put to the test with additional flows from rainfall. This stretch of pipe was along a major thoroughfare and could not be taken out of service which presented unique

Keep reading

Subscribe

Get news delivered straight to your inbox the day it gets published.

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.